Project Name: Construction of the Inspection and Control Building – Abbassiya Execution Date: 2013 Owner: Ministry of Interior Project Description: – The company was assigned to carry out the complete construction of the building, with an area of 15,000 m². – The building consists of 6 floors. -The entire construction work was completed, including the general site works, as well as a ground reservoir with a capacity of 1,000 m³. – The works were completed in a period of two years.